Images coming soon
Tap Follow and we will let you know the moment the first images are public.
Announced

1000 NW 23rd St Tower

Scroll for details
The story so farVerified Nov 21, 2026

A proposed building referred to in an FAA filing as "Rubell Phase II 1-5" is planned at 1000 NW 23rd Street in Miami's Allapattah area.

The filing describes a structure reaching 231 feet above ground level, or 242 feet above mean sea level, across two survey points. The FAA obstruction evaluation was filed for a proposed building development project, with a 1A survey uploaded. The applicant is Tcg Sp23 LLC, represented by Capitol Airspace Group. The filing does not state the program, floor count or unit count.

AnnouncedBreaking GroundConstructionOpening SoonNow Open
Expected opening date TBD
Filed with the FAA Oct 8, 2026

231 ft building, sponsor Tcg Sp23 LLC.

oeaaa.faa.gov
Announced 2026 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
The Miami market 150-project pipelineAllapattah 56,478 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing

Nearby and comparables

Companies and contacts

Every firm on 1000 NW 23rd St Tower, the office nearest it, and the people who work on it.

No firms listed on 1000 NW 23rd St Tower yet.

Common questions

Frequently asked

Where is 1000 NW 23rd St Tower located?

1000 NW 23rd St Tower is located in Miami.

When will 1000 NW 23rd St Tower be built?

1000 NW 23rd St Tower is an announced development that has not yet started construction.