Binghatti City in Dubai
Under Construction

Binghatti City

Scroll for details
The story so farVerified Nov 7, 2026

Binghatti City is under way since 2026, with full build-out in 2030.

A 230-acre site. Mercedes-Benz Places | Binghatti City is Binghatti's first master-planned community and the world's first Mercedes-Benz-branded city, a Dh30 billion district on more than 10 million square feet in Nad Al Sheba 1 beside the Meydan Racecourse, at the junction of Al Khail Road and Sheikh Mohammed Bin Zayed Road, about eight minutes from Downtown Dubai. The plan holds 12 residential towers with nearly 9 million square feet of built area and about 13,386 homes: 6,321 studios, 4,963 one-bedrooms, 1,653 two-bedrooms, 431 three-bedrooms and 18 four- and five-bedroom residences. Each tower is named for a Mercedes-Benz concept car, among them Vision One-Eleven, Vision Mercedes Simplex, Vision Mercedes-Maybach 6 and Vision AVTR, and the 11 secondary towers step down in height from the centerpiece, the 341-meter, 78-story Vision Iconic. Architecture is by Binghatti's in-house studio with Mercedes-Benz design input, and interiors carry the brand's black-and-silver palette in leather and wood. The Grand Promenade, a landscaped central park with water features, shaded groves, art pavilions and elevated walkways, anchors the amenity program of family and infinity pools, splash zones, gyms, sky jogging tracks, 12 specialized sports clubs (padel, squash, climbing, archery, Pilates, spin, golf simulators), a ballroom, event hall, screening lounge, e-sports lounge, concierge and integrated EV infrastructure. Binghatti is self-financing the project from equity and cash flow and delivering it in three phases. It is distinct from Mercedes-Benz Places Dubai, the Binghatti–Mercedes-Benz tower in Downtown Dubai launched in 2024. Official page: binghatti.com/en/branded-projects/mercedes-benz-places-binghatti-city.

AnnouncedBreaking GroundConstructionOpening SoonNow Open
Delivers in phases · 1 component
Expected opening 2030 est.
Under construction Oct 2026 est.
oftmw.com
Sales launched Jan 2026

Sales launched at the Meydan launch event, January 2026: studios from about Dh1.6M, one-beds Dh2.6M; delivery in three phases over roughly three and a half years.

gulfnews.com
Broke ground 2026
oftmw.com
Announced 2026 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
The Dubai market 78-project pipelineMeydan 56,327 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing
Amenities 1
  • Park

Nearby and comparables

Companies and contacts

Every firm on Binghatti City, the office nearest it, and the people who work on it.

Project website
Developer
Architect
Inside this development
1 direct component.
Common questions

Frequently asked

Where is Binghatti City located?

Binghatti City is located in Dubai.

When will Binghatti City be completed?

Binghatti City is under construction, with completion expected in 2030.

How will Binghatti City be built out?

Binghatti City is a phased, multi-component development with 1 tracked component delivering on a rolling schedule. Full build-out is expected in 2030.

Who is developing Binghatti City?

Binghatti is the developer behind Binghatti City.

Who designed Binghatti City?

Binghatti City was designed by Binghatti.