Brent Cross Town in London
Under Construction

Brent Cross Town

Scroll for details
The story so farVerified Nov 8, 2026

Brent Cross Town is one of the UK's largest regeneration projects, transforming 180 acres of brownfield land in Brent Cross and Cricklewood, in the London Borough of Barnet, into a new park town for north-west London, at 145 Claremont Road with 6700 residences, under way since 2020 and set to finish in 2035. Financed with $97M from LaSalle Investment Management in November 2023.

Studio to four-bedroom residences. A 180-acre site. Delivered by Related Argent — a joint venture between Related and Argent — in partnership with Barnet Council, the masterplan sets out up to 6,700 new homes across for-sale, build-to-rent, affordable, student, co-living, and retirement tenures around 50 acres of parks and playing fields. The mixed-use scheme also brings around 3 million square feet of offices and innovation space, new schools, indoor sports facilities, a new high street, and its own mainline railway station, Brent Cross West. Designed as a sustainable, walkable neighbourhood with a landscape-led masterplan, it is anchored by tenants including a new Sheffield Hallam University campus.

AnnouncedBreaking GroundConstructionOpening SoonNow Open
Expected opening 2035
Under construction
Tenant announced Sep 16, 2026

Slomo saunas announced as the latest wellness operator coming to Brent Cross Town.

brentcrosstown.co.uk
Tenant signs Sep 2026

Holybella (Mediterranean all-day dining and patisserie), Stamp and Social Pottery (pottery studio) sign for Neighbourhood Square, joining GAIL's, Co-op and Karma Bread.

premierconstructionnews.com
SNG signs for 82 more social rent homes Aug 2026

Sovereign Network Group exchanged contracts with Related Argent in August 2026 for 82 social rent apartments on the final Market Quarter plot in phase three, taking its Brent Cross Town total to 132.

barnetpost.co.uk
UK-first low-carbon concrete pour May 2026

Contractor Midgard casts a permanent suspended slab in the third build-to-rent building using calcined clay concrete, replacing 30% of the cement and cutting embodied carbon 10%.

specificationonline.co.uk
Second rental building complete Feb 2026

Galliford Try finished the second build-to-rent building at Brent Cross Town.

specificationonline.co.uk
Resident move-in Aug 2025

The Maple (Plot 13) phase complete: 249 build-to-rent homes across four blocks of 8 to 16 stories.

gallifordtry.co.uk
Financing secured Jun 2024

NatWest green loan of £62.7M funds 3 Copper Square, the 239,000 sq ft first office building.

relatedargent.co.uk
Broke ground 2020
Announced 2020 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
The London market 53-project pipelineBrent Cross 23,215 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing
Amenities 16
  • Bar
  • Co-working
  • Concierge
  • Conference room
  • Fitness center
  • Game room
  • Garden
  • Padel
Show all 16Show fewer
  • Park
  • Pool
  • Private dining
  • Residents' club
  • Restaurant
  • Sauna
  • Screening room
  • Sun deck

Nearby and comparables

Companies and contacts

Every firm on Brent Cross Town, the office nearest it, and the people who work on it.

Common questions

Frequently asked

Where is Brent Cross Town located?

Brent Cross Town is located in London.

When will Brent Cross Town be completed?

Brent Cross Town is under construction, with completion expected in 2035.

Who is developing Brent Cross Town?

Related Argent, Barnet Council is the developer behind Brent Cross Town.

Who designed Brent Cross Town?

Brent Cross Town was designed by Allies and Morrison, with interiors by Woods Bagot, Conran and Partners.

Who is building Brent Cross Town?

Brent Cross Town is being built by Galliford Try, Midgard, BAM.