Finale in Breckenridge
Under Construction

Finale

Scroll for details
The story so farVerified Nov 9, 2026

Finale is the last major slopeside development at the base of Peak 8 in Breckenridge, Colorado, a roughly $500 million master plan spanning five parcels that run from the BreckConnect Gondola up to the ski area base, a 7-story building with 36 hotel keys at 355 North Park Avenue that broke ground in June 2025 and is set to finish in 2029.

One- to five-bedroom residences of 1,238 to 3,986 square feet. Led by the Finale Development Partnership with planning and design by DTJ Design, the community brings together the 36-key Imperial Hotel, an upcoming member of The Leading Hotels of the World, alongside the whole-ownership Imperial Chalets, the sixteen Independence Townhomes, and the Victory Ridge collection of ski-in, ski-out estate homesites set on the ridge above the base area. The seven-story, 400,000-square-foot Imperial building anchors the plan with more than 70,000 square feet of amenities, including a signature restaurant, a hidden speakeasy, a rooftop bar, a full-service spa, an indoor water park, a market, and ski shops with direct slope access, while two workforce housing projects, Goldrush Flats and Entrada, are delivered alongside it under the town's development agreement.

AnnouncedBreaking GroundConstructionOpening SoonNow Open
Expected opening 2029
Under construction
Finale sell-through accelerates Jul 2026

10 of the 16 Independence Townhomes are under contract with first closings due December 2026, and 11 of 14 Victory Ridge homesites have sold for more than $85 million at roughly $7.7 million per parcel.

summitdaily.com
Tenant announced Feb 5, 2026

Imperial Hotel anchor announced as a Leading Hotels of the World property (36 keys); Imperial Chalets Phase I launched.

oftmw.com
Independence Townhomes underway 2026

The first of Finale's five parcels broke ground on 16 townhomes, seven of them due late 2026, while infrastructure work begins for the Victory Ridge and Imperial parcels ahead of vertical construction.

oftmw.com
Victory Ridge Phase II released Dec 3, 2025

9 of 14 Phase I homesites under contract (top lot $8.5M); three more ski-in/ski-out lots released at $5.4M to $8.5M.

resident.com
Victory Ridge homesites released Jun 2025

14 slopeside Peak 8 lots priced $5.25M to $8.9M, the highest-priced homesites in Breckenridge.

snowsportsnews.com
Broke ground Jun 2025
Sales launched Mar 2025

Sales launched March 2025 on the 16 Independence Townhomes (from $4.125M); seven under contract by June 2025.

snowsportsnews.com
Announced 2025 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing
Amenities 18
  • Bar
  • Cold plunge
  • Concierge
  • Demonstration kitchen
  • Fitness center
  • Garage
  • Hotel services
  • Pool
Show all 18Show fewer
  • Private dining
  • Residents' club
  • Restaurant
  • Sauna
  • Screening room
  • Ski-in, ski-out
  • Ski valet
  • Spa
  • Steam room
  • Storage

How it stacks up

Companies and contacts

Every firm on Finale, the office nearest it, and the people who work on it.

Common questions

Frequently asked

Where is Finale located?

Finale is located in Breckenridge.

When will Finale be completed?

Finale is under construction, with completion expected in 2029.

Who is developing Finale?

The Finale Development Partnership, Breckenridge Grand Vacations is the developer behind Finale.

Who designed Finale?

Finale was designed by DTJ Design, with interiors by Styleworks.

How big is Finale?

Finale rises 7 stories with 36 hotel keys.