FIVESIXTY in Miami
Under Construction

FIVESIXTY

Scroll for details
The story so farVerified Nov 8, 2026

FIVESIXTY Waterfront Residences + Club is the new name for the 38-story tower Aimco has been building at 560 NE 34th Street on Biscayne Bay in Edgewater, directly across from The Hamilton, the 276-unit building Aimco previously renovated, with 114 residences, under way since 2024 and set to finish in April 2027. Financed with $228M in March 2026.

Three- to four-bedroom rental residences of 2,400 to 3,647 square feet. 10-foot ceilings. Bayfront. Designed by Stantec and rising about 497 feet, the tower has topped out and holds 114 rental residences, with three- and four-bedroom layouts of roughly 2,300 to 3,000 square feet, waterfront views and large private terraces. Residents get The Club at FIVESIXTY, a wellness-and-dining amenity program that includes a bayfront swimming pool and lounge, a private marina for vessels up to 70 feet, fitness, health and spa facilities with infrared saunas, a movement studio, a conservatory, a shaded putting green, a padel court and private executive work suites. A waterfront restaurant from Gioia Hospitality Group occupies the ground-floor retail. SERHANT leads leasing and marketing, KW Property Management runs the building, and tours are by appointment only.

AnnouncedBreaking GroundConstructionOpening SoonNow Open
Expected opening Apr 1, 2027
Tenant signed Jul 2026

Daniel's team signs bayfront restaurant: Gioia Hospitality Group, owner of Daniel's, A Florida Steakhouse, leased about 11,500 sq ft (incl. 2,500 sq ft outdoor) on the ground floor at 560 NE 34th Street for a Rockwell Group-designed waterfront restaurant.

therealdeal.com
Topped out Mar 11, 2026

38-story tower topped out.

floridayimby.com
Financing secured Sep 2024

Aimco closed a $172M senior construction loan from Apollo Global Management plus $56M of preferred equity from Sixth Street.

therealdeal.com
Broke ground 2024
Announced 2024 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
The Miami market 150-project pipelineEdgewater 56,478 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing
Amenities 15
  • Bar
  • Co-working
  • EV charging
  • Fitness center
  • Golf simulator
  • Library
  • Padel
  • Pool
Show all 15Show fewer
  • Residents' club
  • Restaurant
  • Sauna
  • Spa
  • Treatment rooms
  • Wine storage
  • Yoga studio

Nearby and comparables

Companies and contacts

Every firm on FIVESIXTY, the office nearest it, and the people who work on it.

Project website
Developer
Architect
Contractor
Common questions

Frequently asked

Where is FIVESIXTY located?

FIVESIXTY is located in Miami.

When will FIVESIXTY be completed?

FIVESIXTY is under construction, with completion expected on April 1, 2027.

Who is developing FIVESIXTY?

Aimco is the developer behind FIVESIXTY.

Who designed FIVESIXTY?

FIVESIXTY was designed by Stantec.

Who is building FIVESIXTY?

FIVESIXTY is being built by Americaribe, Grycon.