
Owned by Newbond Holdings and managed by Schulte Hospitality, Hotel Cala reimagines the riverfront hotel at 200 North Ashley Drive, first opened in 1968, as a seven-story, 281-room Curio Collection by Hilton property with 16 suites, a 7-story building set to finish in January 2027. Financed with $94.4M from Bain Capital in April 2026.
Riverfront. Rockwell Group led the redesign, drawing on the Hillsborough River, Tampa's tropical character and its Italian and Cuban heritage, with a circular lobby bar under a custom tiered chandelier and cognac fluted tile columns nodding to Ybor City's cigar factories. Tao Group Hospitality brings the Tampa debut of LAVO and the waterfront BarOnda, alongside a resort-style pool deck and 10,000 square feet of event space.
$94.36M loan from Bain Capital and Smith Hill Capital, arranged by Newmark, funds the repositioning of the former Riverwalk hotel into Hotel Cala, Curio Collection by Hilton.
commercialobserver.com- Bar
- Cabanas
- Conference room
- Event space
- Fitness center
- Pool
- Restaurant
Nearby and comparables
Within 2 miles of it, nearest first.
0.2 mi awayONE TampaResidencesDowntown TampaUnder ConstructionView project
0.2 mi awayManor Riverwalk DistrictMixed-UseDowntown TampaUnder ConstructionView project
0.2 mi awayThe Pendry Tampa and ResidencesMixed-UseDowntown Tampa RiverwalkExpected 2027View project
0.2 mi away601 N. Ashley DriveMixed-UseDowntown TampaAnnouncedView project
0.3 mi awayTampa Museum of Art ExpansionMuseumDowntown TampaBreaking GroundView project
0.5 mi awayThe Tampa EDITIONHotelWater Street TampaOpened 2022View project
0.5 mi awayWater Street Phase TwoMixed-UseWater Street TampaExpected 2029View project
0.6 mi awayWater Street and Cumberland Avenue TowerResidencesWater StreetExpected 2029View project
0.6 mi awayHotel Ora + Private ResidencesMixed-UseDowntown TampaExpected 2029View project
0.6 mi awayTGH Taneja Surgical, Neuroscience & Transplant TowerHealthcareDavis IslandsUnder ConstructionView projectThe projects most like it in its market. Tap one to go head to head.
Companies and contacts
Every firm on Hotel Cala Tampa, the office nearest it, and the people who work on it.
Frequently asked
Where is Hotel Cala Tampa located?
Hotel Cala Tampa is located in Tampa.
When will Hotel Cala Tampa open?
Hotel Cala Tampa is opening soon, with completion expected in January 2027.
Who is developing Hotel Cala Tampa?
Newbond Holdings is the developer behind Hotel Cala Tampa.
Who designed Hotel Cala Tampa?
Hotel Cala Tampa was designed by Rockwell Group, with interiors by Rockwell Group.
How big is Hotel Cala Tampa?
Hotel Cala Tampa rises 7 stories with 281 hotel keys.
23 mi away
23 mi away
0.6 mi away