Hudson's Detroit in Detroit
Opening Soon

Hudson's Detroit

Scroll for details
The story so farVerified Nov 14, 2026

Hudson's Detroit is Bedrock's roughly $1 billion mixed-use development on the former J.L. Hudson's department store site at 1240 Woodward Avenue in downtown Detroit, a 45-story tower with 96 residences and 227 hotel keys at 1208 Woodward Avenue that broke ground in December 2017 and is set to finish in 2027.

One- to four-bedroom residences of 720 to 4,500 square feet. 10-foot ceilings. Designed by SHoP Architects, its 685-foot tower is Michigan's second-tallest building and houses The Detroit EDITION hotel beneath The Residences at The Detroit EDITION, a collection of for-sale condominiums. The destination blends five-star hospitality, luxury residences, Class A office space anchored by General Motors' global headquarters, retail, and public gathering spaces.

AnnouncedBreaking GroundConstructionOpening SoonNow Open
Expected opening 2027
Pine Hall opens atop Hudson's Detroit Jun 11, 2026

Union Square Hospitality Group's 300-seat rooftop tavern with a 3,300 sf wraparound terrace opened on the 12th floor of the office block on June 11, 2026.

crainsdetroit.com
Sales launched Mar 31, 2026

Pre-sales launched Mar 31, 2026 for the 96 Residences at The Detroit EDITION atop the tower.

bedrockdetroit.com
Tenant announced Oct 10, 2025

12-story office building (1240 Woodward) delivered; first retail tenant Tecovas opened.

rebusinessonline.com
TCO received Oct 9, 2025

Office component (1240 Woodward, 400k+ sf Class A, GM anchor tenant) completed and opened; public plaza unveiled Nov 2025. Residential/hotel tower opening 2027 (Bedrock).

bedrockdetroit.com
Resident move-in Oct 2025

Office phase complete: Bedrock delivered the 12-story, 400,000+ sq ft Class A block at 1240 Woodward, anchored by General Motors, Accenture and the Gilbert Family Office, with its rooftop lounge following in 2026. The 45-story, 685-ft tower carrying the Detroit EDITION hotel and residences remains on a 2027 opening.

rebusinessonline.com
Topped out Apr 10, 2024

685-ft tower (The Detroit EDITION hotel + 97 condos) topped out Apr 10 2024 (Bedrock).

bedrockdetroit.com
Broke ground Dec 14, 2017
Announced 2017 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
The Detroit market 3-project pipelineDowntown Detroit 873 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing
Amenities 20
  • Bar
  • Co-working
  • Event space
  • Fitness center
  • Garage
  • Golf simulator
  • Hotel services
  • Kids club
Show all 20Show fewer
  • Music room
  • Outdoor kitchen
  • Pool
  • Private dining
  • Residents' club
  • Restaurant
  • In-residence dining
  • Sauna
  • Spa
  • Steam room
  • Sun deck
  • Valet

Nearby

Companies and contacts

Every firm on Hudson's Detroit, the office nearest it, and the people who work on it.

Common questions

Frequently asked

Where is Hudson's Detroit located?

Hudson's Detroit is located in Detroit.

When will Hudson's Detroit open?

Hudson's Detroit is opening soon, with completion expected in 2027.

Who is developing Hudson's Detroit?

Bedrock Detroit is the developer behind Hudson's Detroit.

Who designed Hudson's Detroit?

Hudson's Detroit was designed by SHoP Architects, with interiors by Yabu Pushelberg.

Who is building Hudson's Detroit?

Hudson's Detroit is being built by Barton Malow.