
Metropolitan Park is a roughly $8.1 billion mixed-use entertainment district taking shape on about 50 acres of asphalt parking lots surrounding Citi Field in Willets Point, Queens, developed by Mets owner Steve Cohen's Queens Future with Hard Rock International, a 28-story tower with 1000 hotel keys at 121-09 Roosevelt Avenue set to finish in June 2030.
A 50-acre site. SHoP Architects leads the buildings and James Corner Field Operations the landscape, and the plan's defining move is giving roughly half the site back as public space: 25 acres of parkland with lawns, winding paths and broad outdoor steps that climb toward the resort. The program pairs a Hard Rock-branded hotel of about 1,000 rooms, heavy on suites, with a casino and sportsbook, a 5,650-seat indoor entertainment venue, a Taste of Queens food hall, restaurants, retail, and meeting and event space, all served by structured parking that replaces the surface lots. A full rebuild of the Mets–Willets Point subway station brings ADA accessibility along with new pedestrian and bicycle connections, knitting a stadium precinct that sat empty most of the year into a year-round destination beside Flushing Meadows–Corona Park.
315 ft building, sponsor Hard Rock International Worldwide Hq.
oeaaa.faa.govThe NYC Public Design Commission criticized SHoP Architects and Field Operations for insufficient public space and for adding a second, unapproved hotel tower to the Metropolitan Park plan.
queensledger.comState filings show Metropolitan Park about 5.5 months behind plan, with garage test piling only just begun and main casino construction (planned for April 2026) not yet started; first garage targeted November 2027, second April 2028, casino completion June 2030.
queenseagle.comSite preparation and garage test piling are underway, but casino construction is running months late, with the full district still targeted for June 2030.
queenseagle.comThe New York State Gaming Commission votes to grant Metropolitan Park a downstate casino licence, unlocking the $8.1bn Willets Point build.
queenseagle.com- Bar
- Event space
- Garden
- Park
- Playground
- Restaurant
Nearby and comparables
The closest projects to it, nearest first.
0.4 mi awayEtihad ParkStadiumWillets PointOpens Jul 17, 2027View project
1.1 mi awayFlushing Commons Phase IIMixed-UseFlushingExpected Jun 2029View projectImages coming soon3.9 mi away35-10 Steinway StreetResidencesAstoriaExpected Jan 2029View project
4.2 mi awayBally's BronxHotelThroggs NeckExpected 2030View project
4.5 mi awayThe PeninsulaMixed-UseHunts PointExpected 2028View project
4.6 mi awayArcher Towers IIResidencesJamaicaExpected 2028View project
4.9 mi awayRadiantResidencesLong Island CityOpened 2026View projectImages coming soon4.9 mi awayVERAResidencesLong Island CityBreaking GroundView project
5.1 mi away24-19 Jackson AvenueResidencesCourt SquareUnder ConstructionView project
5.2 mi awayParagonResidencesHunters PointExpected Nov 2026View projectThe projects most like it in its market. Tap one to go head to head.
Companies and contacts
Every firm on Metropolitan Park, the office nearest it, and the people who work on it.
Oct 2024New renderings for Metropolitan Park, the $8 billion mixed-use development in QueensFrequently asked
Where is Metropolitan Park located?
Metropolitan Park is located in New York City.
When will Metropolitan Park be completed?
Metropolitan Park is breaking ground, with completion targeted in June 2030.
Who is developing Metropolitan Park?
Hard Rock International is the developer behind Metropolitan Park.
Who designed Metropolitan Park?
Metropolitan Park was designed by SHoP Architects.
How big is Metropolitan Park?
Metropolitan Park rises 28 stories with 1000 hotel keys.
7.2 mi away
5.8 mi away
9.2 mi away