New Trafford is Manchester United's proposed 100,000-seat stadium, which would be the largest football ground in the United Kingdom, rising on a roughly 10-hectare site in Trafford Wharfside about 350 metres north-west of Old Trafford, bounded by Wharfside Way, Europa Way and John Gilbert Way, set to finish in 2035.
Designed by Foster + Partners at an estimated cost of around 2 billion pounds, the bowl is wrapped by a lightweight umbrella-like canopy slung from three 200-metre masts nicknamed the trident, which harvest rainwater and shelter a public plaza roughly twice the size of Trafalgar Square. The stadium anchors a far larger scheme: Allies and Morrison's masterplan for 150 hectares of the Trafford Wharfside area sets out about 15,000 new homes in blocks of six to twenty-five stories, with taller elements permitted where viability allows, alongside commercial and cultural space, waterfront regeneration along the Manchester Ship Canal and Salford Quays, upgraded transport infrastructure and a city-scale park linking the ground to Daniel Libeskind's Imperial War Museum North. Manchester United put the wider regeneration's value at some 7.3 billion pounds a year to the UK economy and tens of thousands of jobs, with Old Trafford itself expected to be retained and downsized rather than demolished.
Trafford Council's eight-week consultation on the draft Trafford Wharfside Strategic Masterplan anchoring the 100,000-seat stadium closed, with the revised masterplan returning to the council for adoption.
trafford.citizenspace.comCity AM reports Trafford Council's Wharfside Strategic Masterplan consultation draft leaves the 100,000-seat stadium out of phase one (2025-2030) and places it in phase two (2031-2035), casting doubt on the club's five-year target; United is also eyeing the 2035 Women's World Cup final, and funding has yet to be secured.
cityam.comManchester United confirmed via its fans' forum that Foster + Partners is officially appointed to design the new 100,000-seat stadium, with the focus now shifting from masterplanning to the stadium's detailed design phase (also reported by StadiumDB).
sports.yahoo.comTrafford Council's Executive Committee agreed the draft 150-hectare Trafford Wharfside Strategic Masterplan built around the 100,000-seat stadium on 20 July 2026, opening an eight-week public consultation running 28 July to 22 September 2026. Masterplan by Allies and Morrison with Civic, SLA and JLL; a stadium planning application is still to be submitted.
trafford.gov.ukManchester United acquired the 25-acre site north-west of Old Trafford from Indurent (Blackstone), per the club's release; planning application still to come.
secure.businesswire.comMan United secured majority of stadium-district land from Indurent (Blackstone).
architectsjournal.co.ukNearby
The closest projects to it, nearest first.
Companies and contacts
Every firm on New Trafford, the office nearest it, and the people who work on it.
Frequently asked
Where is New Trafford located?
New Trafford is located in Manchester.
When will New Trafford be built?
New Trafford is an announced development that has not yet started construction, targeting completion in 2035.
Who is developing New Trafford?
Manchester United Football Club is the developer behind New Trafford.
Who designed New Trafford?
New Trafford was designed by Foster + Partners.