Oasis Hallandale in Hallandale Beach
Under Construction

Oasis Hallandale

Scroll for details
The story so farVerified Nov 12, 2026

Oasis Hallandale is a ten-acre master-planned mixed-use district in Hallandale Beach, Florida, developed by Giuseppe Iadisernia and designed by Arquitectonica, with MGM Construction Group as construction manager, a 25-story tower with 500 residences at 1000 E Hallandale Beach Boulevard that broke ground in August 2023 and is set to finish in 2027. Financed with $112M from S3 Capital in May 2025.

One- to three-bedroom residences of 897 to 4,756 square feet. A 10-acre site. Twin 25-story towers, known as the West Tower and the East Tower, hold roughly 500 condominium residences ranging from about 900 to 4,750 square feet, stacked above an activated commercial base of some 95,000 square feet of retail, dining and office space. Arquitectonica's design treats the two towers as a paired composition on the Hallandale Beach Boulevard corridor, with a resort-style amenity podium between them carrying pools, fitness and wellness space, co-working lounges and landscaped terraces. The scale of the site lets the project function as a neighborhood rather than a single building, adding walkable street-level commercial space to a stretch of Broward County that has historically been car-dependent. Positioned between Aventura and Hollywood, minutes from Gulfstream Park, the Diplomat Golf and Tennis Club and the Atlantic beaches, Oasis Hallandale is the largest ground-up mixed-use development in Hallandale Beach and a template for the density now reshaping the South Broward corridor.

AnnouncedBreaking GroundConstructionOpening SoonNow Open
Expected opening 2027
West Tower closings begin Aug 2026

Full TCO secured for the 25-story, 250-residence West Tower and buyer closings are underway with the tower 85% sold; East Tower still targeting 2027.

citybiz.co
TCO received Aug 2026

West Tower received its TCO and closings began, with the tower 85% sold.

floridayimby.com
Financing secured Aug 2026

Cottonwood Group lends $50M mezzanine on the East Tower: developer Giuseppe Iadisernia draws additional capital, arranged by WD Capital Group, to carry the 250-unit East Tower through completion and condominium sellout.

commercialobserver.com
Topped out Mar 15, 2026

East Tower (final residential tower) topped out, citybiz.

floridayimby.com
East Tower tops out Mar 2026

The second 25-story tower reached its full height.

floridayimby.com
Halfway there Nov 2025

East Tower passed halfway (14th of 25 floors).

floridayimby.com
Going vertical May 2025

East Tower began vertical construction.

floridayimby.com
Broke ground Aug 2023
Announced 2023 est.
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
The Hallandale Beach market 5-project pipeline 732 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing
Amenities 70,000 sq ft 22
  • Bar
  • Cabanas
  • Co-working
  • Cold plunge
  • Conference room
  • Dog park
  • Doorman
  • EV charging
Show all 22Show fewer
  • Event space
  • Fire pit
  • Fitness center
  • Game room
  • Golf simulator
  • Kids club
  • Outdoor kitchen
  • Pet spa
  • Playground
  • Pool
  • Screening room
  • Storage
  • Valet
  • Yoga studio

Nearby and comparables

Companies and contacts

Every firm on Oasis Hallandale, the office nearest it, and the people who work on it.

Common questions

Frequently asked

Where is Oasis Hallandale located?

Oasis Hallandale is located in Hallandale Beach.

When will Oasis Hallandale be completed?

Oasis Hallandale is under construction, with completion expected in 2027.

Who is developing Oasis Hallandale?

Giuseppe Iadisernia is the developer behind Oasis Hallandale.

Who designed Oasis Hallandale?

Oasis Hallandale was designed by Arquitectonica, with interiors by Domus Aurea Interiors.

Who is building Oasis Hallandale?

Oasis Hallandale is being built by MGM Construction Group.