Parcel C1 Hotel in Nashville
Announced

Parcel C1 Hotel

Scroll for details
The story so farVerified Nov 9, 2026

The Parcel C1 hotel is the 600-key full-service anchor of The Fallon Company's 30-acre Eastpoint district on Nashville's East Bank, rising beside the new Nissan Stadium and designed by HKS, breaking ground in October 2027 and set to finish in December 2030.

The plan includes 75 suites, 20,000 square feet of retail and 35,000 square feet of event space, an outdoor terrace with a pool on the fourth level, three levels of underground parking with about 500 spaces, and a distinctive structural element at the top of the building housing a food and beverage concept. Brasfield & Gorrie is the general contractor. The hotel brand, a public company, has not yet been announced, and Metro must deliver water, sewer, electric and gas infrastructure before construction can begin. At 600 rooms it would rank as the third-largest hotel in downtown Nashville.

AnnouncedBreaking GroundConstructionOpening SoonNow Open
Expected opening Dec 2030
Expected groundbreaking Oct 2027
Announced May 9, 2026
oftmw.com
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
The Nashville market 57-project pipelineEast Bank 20,268 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing
Amenities 3
  • Event space
  • Garage
  • Pool

Nearby and comparables

Companies and contacts

Every firm on Parcel C1 Hotel, the office nearest it, and the people who work on it.

Developer
Architect
Part of Eastpoint
Parcel C1 Hotel is one of 1 connected project in this development.
Common questions

Frequently asked

Where is Parcel C1 Hotel located?

Parcel C1 Hotel is located in Nashville, part of Eastpoint.

When will Parcel C1 Hotel be built?

Parcel C1 Hotel is an announced development that has not yet started construction, targeting completion in December 2030.

Who is developing Parcel C1 Hotel?

The Fallon Company is the developer behind Parcel C1 Hotel.

Who designed Parcel C1 Hotel?

Parcel C1 Hotel was designed by Blur Workshop.

How big is Parcel C1 Hotel?

Parcel C1 Hotel features 600 hotel keys.