The Power District in Salt Lake City
Under Construction

The Power District

Scroll for details
The story so farVerified Nov 9, 2026

The Power District is a roughly 100-acre mixed-use megaproject rising on Salt Lake City's west side, transforming the former Rocky Mountain Power industrial site along the Jordan River between downtown and Salt Lake City International Airport, with 4700 residences and 300 hotel keys, under way since October 2025 and set to finish in 2030.

Riverfront. Developed by the Larry H. Miller Company around a master plan by Sasaki, the district is anchored by a new all-electric Rocky Mountain Power corporate headquarters designed by SOM with Architectural Nexus and built by Okland Construction, plus a restored riverfront led by James Corner Field Operations. At full buildout it is planned to deliver about 4,700 homes, roughly 1.3 million square feet of office, around 300 hotel keys, and some 320,000 square feet of retail, alongside parks, trails, and entertainment uses. The Power District also holds the shovel-ready site at the center of Utah's bid to land a Major League Baseball expansion franchise.

AnnouncedBreaking GroundConstructionOpening SoonNow Open
Expected opening 2030
First building tops out Sep 9, 2026

Final beam placed on Rocky Mountain Power's 10-story headquarters, the district's first vertical building.

powerdistrict.com
Jordan River restoration plan unveiled Feb 26, 2026

Larry H. Miller Real Estate revealed a one-mile riverfront loop along a half-mile stretch of the Jordan River at North Temple, designed by Field Operations, with water-quality work, native planting and new public access tying into the 51-mile Jordan River Parkway.

oftmw.com
Ballpark parcel targeted shovel-ready by October 2026 2026

Larry H. Miller Real Estate is prepping the district's central MLB expansion site to line up with the league's collective-bargaining window, while the first building, Rocky Mountain Power's 10-story headquarters, is now due to finish in September 2027.

oftmw.com
Going vertical Oct 27, 2025

Went vertical on the first building, a 10-story, 300,000 sf all-electric Rocky Mountain Power corporate campus (completion 2027).

lhm.com
Broke ground Oct 27, 2025
Announced Feb 15, 2024

Larry H. Miller Company unveils $3.5B Power District master plan for SLC's west side (former Rocky Mountain Power site); ~4,700 homes, offices, hotel, retail, parks, MLB-ready ballpark site.

utahnewsdispatch.com
Milestones are dated to when they actually happened and linked to their source. This record fills in over time as TMW tracks the project.
The Salt Lake City market 4-project pipelineFairpark 5,318 residences and keys across the projects in our database Explore the market →
Pro tools
Compare projectsSide by side with its nearest compsAnalyze the marketModeled pricing, comps and timing
Amenities 3
  • Park
  • Restaurant
  • Trails

Nearby and comparables

Companies and contacts

Every firm on The Power District, the office nearest it, and the people who work on it.

Project website
Architect
Landscape
Common questions

Frequently asked

Where is The Power District located?

The Power District is located in Salt Lake City.

When will The Power District be completed?

The Power District is under construction, with completion expected in 2030.

Who is developing The Power District?

Larry H. Miller Company is the developer behind The Power District.

Who designed The Power District?

The Power District was designed by HOK.

Who is building The Power District?

The Power District is being built by Okland Construction.